VCA2617EVM

Mfr. #: VCA2617EVM
Өндіруші: Texas Instruments
Сипаттама: EVALUATION MODULE FOR VCA2617
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: VCA2617EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
VCA2617EVM Overview

Product belongs to the - series. Operational temperature range: -40°C ~ 85°C Output-Type: Differential Voltage supply range: 4.75 V ~ 5.25 V The 50MHz The 100 V/μs. Current-Output-Channel is 60mA The amplifier is of Variable Gain type. Included item: Board. IC package type: VCA2617 Board type: Fully Populated. The product has 2 - Dual channel per IC.

VCA2617EVM Image

VCA2617EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

VCA2617EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Operating-Temperature -40°C ~ 85°C
  • Output-Type Differential
  • Voltage-Supply-Single-Dual 4.75 V ~ 5.25 V
  • -3db-Bandwidth 50MHz
  • Slew-Rate 100 V/μs
  • Current-Output-Channel 60mA
  • Amplifier-Type Variable Gain
  • Supplied-Contents Board
  • Utilized-IC-Part VCA2617
  • Board-Type Fully Populated
  • Channels-per-IC 2 - Dual
  • Current-Supply-Main-IC -

VCA2617EVM

VCA2617EVM Specifications

VCA2617EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Operating-Temperature?

    Q: Yes, the product's Operating-Temperature is indeed -40°C ~ 85°C

  • A: At what frequency does the Output-Type?

    Q: The product Output-Type is Differential.

  • A: At what frequency does the Voltage-Supply-Single-Dual?

    Q: The product Voltage-Supply-Single-Dual is 4.75 V ~ 5.25 V.

  • A: What is the -3db-Bandwidth of the product?

    Q: The -3db-Bandwidth of the product is 50MHz.

  • A: At what frequency does the Slew-Rate?

    Q: The product Slew-Rate is 100 V/μs.

  • A: At what frequency does the Current-Output-Channel?

    Q: The product Current-Output-Channel is 60mA.

  • A: At what frequency does the Amplifier-Type?

    Q: The product Amplifier-Type is Variable Gain.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed VCA2617

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: Is the cutoff frequency of the product Channels-per-IC?

    Q: Yes, the product's Channels-per-IC is indeed 2 - Dual

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
223,50 $
223,50 $
10
212,32 $
2 123,25 $
100
201,15 $
20 115,00 $
500
189,98 $
94 987,50 $
1000
178,80 $
178 800,00 $
Top