VCA2615EVM

Mfr. #: VCA2615EVM
Өндіруші: Texas Instruments
Сипаттама: EVALUATION MODULE FOR VCA2615
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: VCA2615EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
VCA2615EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Variable Gain Amplifiers Operational temperature range: -40°C ~ 85°C Output-Type: Differential Voltage supply range: 4.75 V ~ 5.25 V The 50MHz The 100 V/μs. Current-Output-Channel is 60mA The amplifier is of Variable Gain type. Included item: Board. IC package type: VCA2615 Board type: Fully Populated. The product has 2 - Dual channel per IC. This product operates at a 5 V +/- 5 V supply voltage for reliable performance. This tool is designed for the VCA2615. Our product measures 4.5 in x 3.5 in in dimensions for compact and convenient use.

VCA2615EVM Image

VCA2615EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

VCA2615EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Product Evaluation Modules
  • Type Variable Gain Amplifiers
  • Operating-Temperature -40°C ~ 85°C
  • Output-Type Differential
  • Voltage-Supply-Single-Dual 4.75 V ~ 5.25 V
  • -3db-Bandwidth 50MHz
  • Slew-Rate 100 V/μs
  • Current-Output-Channel 60mA
  • Amplifier-Type Variable Gain
  • Supplied-Contents Board
  • Utilized-IC-Part VCA2615
  • Board-Type Fully Populated
  • Channels-per-IC 2 - Dual
  • Current-Supply-Main-IC -
  • Operating-Supply-Voltage 5 V +/- 5 V
  • Tool-Is-For-Evaluation-Of VCA2615
  • Dimensions 4.5 in x 3.5 in

VCA2615EVM

VCA2615EVM Specifications

VCA2615EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Variable Gain Amplifiers.

  • A: What is the Operating-Temperature of the product?

    Q: The Operating-Temperature of the product is -40°C ~ 85°C.

  • A: What is the Output-Type of the product?

    Q: The Output-Type of the product is Differential.

  • A: At what frequency does the Voltage-Supply-Single-Dual?

    Q: The product Voltage-Supply-Single-Dual is 4.75 V ~ 5.25 V.

  • A: At what frequency does the -3db-Bandwidth?

    Q: The product -3db-Bandwidth is 50MHz.

  • A: What is the Slew-Rate of the product?

    Q: The Slew-Rate of the product is 100 V/μs.

  • A: What is the Current-Output-Channel of the product?

    Q: The Current-Output-Channel of the product is 60mA.

  • A: Is the cutoff frequency of the product Amplifier-Type?

    Q: Yes, the product's Amplifier-Type is indeed Variable Gain

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed VCA2615

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: At what frequency does the Channels-per-IC?

    Q: The product Channels-per-IC is 2 - Dual.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 5 V +/- 5 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed VCA2615

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 4.5 in x 3.5 in.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
172,52 $
172,52 $
10
163,89 $
1 638,89 $
100
155,26 $
15 526,35 $
500
146,64 $
73 318,90 $
1000
138,01 $
138 012,00 $
Top