TSW3070EVM

Mfr. #: TSW3070EVM
Өндіруші: Texas Instruments
Сипаттама: TSW3070EVM
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TSW3070EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TSW3070EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: DAC The Timing, Waveform Generator is the Main-Purpose. Primary-Attributes: - IC package type: CDM7005, DAC5682Z, OPA695, THS3095 This product operates at a 2.8 V to 3.8 V supply voltage for reliable performance. This tool is designed for the DAC5682Z THS3095. SMA USB interface type

TSW3070EVM Image

TSW3070EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TSW3070EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type DAC
  • Main-Purpose Timing, Waveform Generator
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part CDM7005, DAC5682Z, OPA695, THS3095
  • Operating-Supply-Voltage 2.8 V to 3.8 V
  • Tool-Is-For-Evaluation-Of DAC5682Z THS3095
  • Interface-Type SMA USB

TSW3070EVM

TSW3070EVM Specifications

TSW3070EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is DAC.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Timing, Waveform Generator.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is CDM7005, DAC5682Z, OPA695, THS3095.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 2.8 V to 3.8 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC5682Z THS3095.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
777,24 $
777,24 $
10
738,38 $
7 383,78 $
100
699,52 $
69 951,60 $
500
660,65 $
330 327,00 $
1000
621,79 $
621 792,00 $
Top