TRF37B73EVM

Mfr. #: TRF37B73EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MODULE FOR TRF37A73
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TRF37B73EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF37B73EVM Overview

Compatible with TRF37B73. Product belongs to the - series. This product is categorized as Evaluation Modules Type: Amplifier This product's 1MHz ~ 6GHz range is 0Hz to 2.2GHz. Included item: Board. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TRF37B73.

TRF37B73EVM Image

TRF37B73EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF37B73EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products TRF37B73
  • Series -
  • Product Evaluation Modules
  • Type Amplifier
  • Frequency 1MHz ~ 6GHz
  • Supplied-Contents Board
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TRF37B73

TRF37B73EVM

TRF37B73EVM Specifications

TRF37B73EVM FAQ
  • A: What is the For-Use-With-Related-Products of the product?

    Q: The For-Use-With-Related-Products of the product is TRF37B73.

  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Amplifier

  • A: At what frequency does the Frequency?

    Q: The product Frequency is 1MHz ~ 6GHz.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TRF37B73.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
56,74 $
56,74 $
10
53,91 $
539,08 $
100
51,07 $
5 107,05 $
500
48,23 $
24 116,65 $
1000
45,40 $
45 396,00 $
Top