TRF37A73EVM

Mfr. #: TRF37A73EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MODULE FOR TRF37A73
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TRF37A73EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF37A73EVM Overview

Compatible with TRF37A73. Product belongs to the - series. This product is categorized as Evaluation Modules Type: Amplifier Bulk is the packaging method for this product This product's 1MHz ~ 6GHz range is 0Hz to 2.2GHz. Included item: Board. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TRF37A73.

TRF37A73EVM Image

TRF37A73EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF37A73EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products TRF37A73
  • Series -
  • Product Evaluation Modules
  • Type Amplifier
  • Packaging Bulk
  • Frequency 1MHz ~ 6GHz
  • Supplied-Contents Board
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TRF37A73

TRF37A73EVM

TRF37A73EVM Specifications

TRF37A73EVM FAQ
  • A: What is the For-Use-With-Related-Products of the product?

    Q: The For-Use-With-Related-Products of the product is TRF37A73.

  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Amplifier

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 1MHz ~ 6GHz

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TRF37A73.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
56,74 $
56,74 $
10
53,91 $
539,08 $
100
51,07 $
5 107,05 $
500
48,23 $
24 116,65 $
1000
45,40 $
45 396,00 $
Top