TRF3722EVM

Mfr. #: TRF3722EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MODULE FOR TRF3722
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TRF3722EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TRF3722EVM Overview

Compatible with TRF3722. Product belongs to the - series. This product is categorized as Evaluation Modules Type: Modulator Bulk is the packaging method for this product This product is designed TRF3722 amplifier. This product's 400MHz ~ 4.1GHz range is 0Hz to 2.2GHz. Included item: Board. This product operates at a 3.3 V supply voltage for reliable performance. This product is an TRF3722 evaluation module. This tool is designed for the TRF3722.

TRF3722EVM Image

TRF3722EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TRF3722EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category RF Evaluation and Development Kits, Boards
  • For-Use-With-Related-Products TRF3722
  • Series -
  • Product Evaluation Modules
  • Type Modulator
  • Packaging Bulk
  • For-Use-With TRF3722
  • Frequency 400MHz ~ 4.1GHz
  • Supplied-Contents Board
  • Operating-Supply-Voltage 3.3 V
  • Description-Function TRF3722 evaluation module
  • Tool-Is-For-Evaluation-Of TRF3722

TRF3722EVM

TRF3722EVM Specifications

TRF3722EVM FAQ
  • A: Is the cutoff frequency of the product For-Use-With-Related-Products?

    Q: Yes, the product's For-Use-With-Related-Products is indeed TRF3722

  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Modulator

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the For-Use-With of the product?

    Q: The For-Use-With of the product is TRF3722.

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 400MHz ~ 4.1GHz

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is TRF3722 evaluation module.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TRF3722.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
298,50 $
298,50 $
10
283,58 $
2 835,75 $
100
268,65 $
26 865,00 $
500
253,72 $
126 862,50 $
1000
238,80 $
238 800,00 $
Top