| Mfr. #: | TPS79301EVM |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | EVAL MOD FOR TPS79301 |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | TPS79301EVM Деректер тізімі |


Product belongs to the - series. This product is categorized as Evaluation Boards Type: LDO Voltage Regulators Operational temperature range: -40°C ~ 125°C 2.7 V ~ 5.5 V voltage input Output voltage: 1.5V Included item: Board. IC package type: TPS79301 Board type: Fully Populated. The product has 1 - Single channel per IC. This product features a Positive Adjustable. Output voltage: 1.5 V to 2.8 V This tool is designed for the TPS79301. Our product measures 17.9 mm x 14.5 mm in dimensions for compact and convenient use. Input Voltage Range: 2.7 V to 5.5 V

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS79301EVM Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed -
A: At what frequency does the Product?
Q: The product Product is Evaluation Boards.
A: At what frequency does the Type?
Q: The product Type is LDO Voltage Regulators.
A: Is the cutoff frequency of the product Operating-Temperature?
Q: Yes, the product's Operating-Temperature is indeed -40°C ~ 125°C
A: What is the Voltage-Input of the product?
Q: The Voltage-Input of the product is 2.7 V ~ 5.5 V.
A: Is the cutoff frequency of the product Voltage-Output?
Q: Yes, the product's Voltage-Output is indeed 1.5V
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed TPS79301
A: At what frequency does the Board-Type?
Q: The product Board-Type is Fully Populated.
A: Is the cutoff frequency of the product Channels-per-IC?
Q: Yes, the product's Channels-per-IC is indeed 1 - Single
A: At what frequency does the Regulator-Type?
Q: The product Regulator-Type is Positive Adjustable.
A: What is the Output-Voltage of the product?
Q: The Output-Voltage of the product is 1.5 V to 2.8 V.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TPS79301
A: At what frequency does the Dimensions?
Q: The product Dimensions is 17.9 mm x 14.5 mm.
A: Is the cutoff frequency of the product Input-Voltage?
Q: Yes, the product's Input-Voltage is indeed 2.7 V to 5.5 V