TPS54873EVM

Mfr. #: TPS54873EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MOD FOR TPS54873
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TPS54873EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS54873EVM Overview

Product belongs to the SWIFT series. This product is categorized as Evaluation Boards Type: Voltage Regulators - Switching Regulators Bulk is the packaging method for this product The DC/DC, Step Down is the Main-Purpose. 4 V ~ 6 V voltage input This product features 'Frequency-Switching' at 700kHz for optimal performance. Output voltage: 3.3V Buck regulator topology - Included item: Board. IC package type: TPS54873 Board type: Fully Populated. The product has 1, Non-Isolated outputs. Output voltage: 3.3 V This tool is designed for the TPS54873. Our product measures 76.2 mm x 76.2 mm in dimensions for compact and convenient use. Input Voltage Range: 5 V

TPS54873EVM Image

TPS54873EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS54873EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series SWIFT
  • Product Evaluation Boards
  • Type Voltage Regulators - Switching Regulators
  • Packaging Bulk
  • Main-Purpose DC/DC, Step Down
  • Voltage-Input 4 V ~ 6 V
  • Frequency-Switching 700kHz
  • Current-Output 8A
  • Voltage-Output 3.3V
  • Regulator-Topology Buck
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part TPS54873
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated
  • Output-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TPS54873
  • Dimensions 76.2 mm x 76.2 mm
  • Input-Voltage 5 V

TPS54873EVM

TPS54873EVM Specifications

TPS54873EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is SWIFT.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: What is the Type of the product?

    Q: The Type of the product is Voltage Regulators - Switching Regulators.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is DC/DC, Step Down.

  • A: What is the Voltage-Input of the product?

    Q: The Voltage-Input of the product is 4 V ~ 6 V.

  • A: Is the cutoff frequency of the product Frequency-Switching?

    Q: Yes, the product's Frequency-Switching is indeed 700kHz

  • A: Is the cutoff frequency of the product Voltage-Output?

    Q: Yes, the product's Voltage-Output is indeed 3.3V

  • A: What is the Regulator-Topology of the product?

    Q: The Regulator-Topology of the product is Buck.

  • A: Is the cutoff frequency of the product Power-Output?

    Q: Yes, the product's Power-Output is indeed -

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TPS54873.

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: Is the cutoff frequency of the product Outputs-and-Type?

    Q: Yes, the product's Outputs-and-Type is indeed 1, Non-Isolated

  • A: What is the Output-Voltage of the product?

    Q: The Output-Voltage of the product is 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TPS54873

  • A: At what frequency does the Dimensions?

    Q: The product Dimensions is 76.2 mm x 76.2 mm.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 5 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
11,58 $
11,58 $
10
11,00 $
110,01 $
100
10,42 $
1 042,20 $
500
9,84 $
4 921,50 $
1000
9,26 $
9 264,00 $
Top