TPS2375EVM

Mfr. #: TPS2375EVM
Өндіруші: Texas Instruments
Сипаттама: EVALUATION MODULE FOR TPS2375
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TPS2375EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPS2375EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Hot Swap Voltage Controllers Bulk is the packaging method for this product The Special Purpose DC/DC, Power Over Ethernet is the Main-Purpose. - voltage input This product features 'Frequency-Switching' at - for optimal performance. Output voltage: - - regulator topology - Included item: Board. IC package type: TPS2375 Board type: Fully Populated. The product has - outputs. This tool is designed for the TPS2375. Ethernet interface type Our product measures 73.4 mm x 109.6 mm in dimensions for compact and convenient use.

TPS2375EVM Image

TPS2375EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPS2375EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Product Evaluation Boards
  • Type Hot Swap Voltage Controllers
  • Packaging Bulk
  • Main-Purpose Special Purpose DC/DC, Power Over Ethernet
  • Voltage-Input -
  • Frequency-Switching -
  • Current-Output -
  • Voltage-Output -
  • Regulator-Topology -
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part TPS2375
  • Board-Type Fully Populated
  • Outputs-and-Type -
  • Tool-Is-For-Evaluation-Of TPS2375
  • Interface-Type Ethernet
  • Dimensions 73.4 mm x 109.6 mm

TPS2375EVM

TPS2375EVM Specifications

TPS2375EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Hot Swap Voltage Controllers.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Special Purpose DC/DC, Power Over Ethernet.

  • A: Is the cutoff frequency of the product Voltage-Input?

    Q: Yes, the product's Voltage-Input is indeed -

  • A: At what frequency does the Frequency-Switching?

    Q: The product Frequency-Switching is -.

  • A: At what frequency does the Voltage-Output?

    Q: The product Voltage-Output is -.

  • A: What is the Regulator-Topology of the product?

    Q: The Regulator-Topology of the product is -.

  • A: What is the Power-Output of the product?

    Q: The Power-Output of the product is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TPS2375.

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: What is the Outputs-and-Type of the product?

    Q: The Outputs-and-Type of the product is -.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TPS2375.

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed Ethernet

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 73.4 mm x 109.6 mm

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
73,50 $
73,50 $
10
69,82 $
698,25 $
100
66,15 $
6 615,00 $
500
62,48 $
31 237,50 $
1000
58,80 $
58 800,00 $
Top