TPA2000D2EVM

Mfr. #: TPA2000D2EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MOD FOR TPA2000D2
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TPA2000D2EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TPA2000D2EVM Overview

Product belongs to the - series. Type: Audio Amplifiers Output-Type: 2-Channel (Stereo) Voltage Supply Range: 4.5 V ~ 5.5 V Maximum Output Power of 2W x 2 @ 3 Ohm for 1 channel The amplifier is of Class D type. Included item: Board. IC package type: TPA2000D2 Board type: Fully Populated. This product operates at a 5 V to 15 V supply voltage for reliable performance. This tool is designed for the TPA2000D2.

TPA2000D2EVM Image

TPA2000D2EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TPA2000D2EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Series -
  • Type Audio Amplifiers
  • Output-Type 2-Channel (Stereo)
  • Voltage-Supply 4.5 V ~ 5.5 V
  • Max-Output-Power-x-Channels-Load 2W x 2 @ 3 Ohm
  • Amplifier-Type Class D
  • Supplied-Contents Board
  • Output-Power 2 W
  • Utilized-IC-Part TPA2000D2
  • Board-Type Fully Populated
  • Operating-Supply-Voltage 5 V to 15 V
  • Tool-Is-For-Evaluation-Of TPA2000D2

TPA2000D2EVM

TPA2000D2EVM Specifications

TPA2000D2EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio Amplifiers

  • A: What is the Output-Type of the product?

    Q: The Output-Type of the product is 2-Channel (Stereo).

  • A: Is the cutoff frequency of the product Voltage-Supply?

    Q: Yes, the product's Voltage-Supply is indeed 4.5 V ~ 5.5 V

  • A: At what frequency does the Max-Output-Power-x-Channels-Load?

    Q: The product Max-Output-Power-x-Channels-Load is 2W x 2 @ 3 Ohm.

  • A: Is the cutoff frequency of the product Amplifier-Type?

    Q: Yes, the product's Amplifier-Type is indeed Class D

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TPA2000D2.

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5 V to 15 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TPA2000D2.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
56,74 $
56,74 $
10
53,91 $
539,08 $
100
51,07 $
5 107,05 $
500
48,23 $
24 116,65 $
1000
45,40 $
45 396,00 $
Top