Product belongs to the - series. This product is categorized as Evaluation Boards Type: Temperature Sensors Sensitivity: ±3°C Interface: Analog Voltage Supply Range: 2.7 V ~ 5.5 V Thermostat Sensing range of 0°C ~ 125°C Included item: Board. IC package type: TMP709 Maximum operating temperature of + 125 C This product operates at a 2.7 V to 5.5 V supply voltage for reliable performance. This tool is designed for the TMP709.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP709EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Boards.
A: At what frequency does the Type?
Q: The product Type is Temperature Sensors.
A: What is the Sensitivity of the product?
Q: The Sensitivity of the product is ±3°C.
A: At what frequency does the Interface?
Q: The product Interface is Analog.
A: At what frequency does the Voltage-Supply?
Q: The product Voltage-Supply is 2.7 V ~ 5.5 V.
A: Is the cutoff frequency of the product Sensor-Type?
Q: Yes, the product's Sensor-Type is indeed Thermostat
A: What is the Sensing-Range of the product?
Q: The Sensing-Range of the product is 0°C ~ 125°C.
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: At what frequency does the Utilized-IC-Part?
Q: The product Utilized-IC-Part is TMP709.
A: At what frequency does the Maximum-Operating-Temperature?
Q: The product Maximum-Operating-Temperature is + 125 C.
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 2.7 V to 5.5 V.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TMP709