TMP513EVM

Mfr. #: TMP513EVM
Өндіруші: Texas Instruments
Сипаттама: Sensor Development Tools Temperature Sensor Development Tools TMP513 Eval Mod
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TMP513EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP513EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Temperature Sensors Sensitivity: - Interface: USB Voltage Supply Range: - Temperature Sensing range of - Included item: 2 Boards, Cable. IC package type: TMP513 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product operates at a 26 V supply voltage for reliable performance. This tool is designed for the TMP513.

TMP513EVM Image

TMP513EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP513EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Modules
  • Type Temperature Sensors
  • Sensitivity -
  • Interface USB
  • Voltage-Supply -
  • Sensor-Type Temperature
  • Sensing-Range -
  • Supplied-Contents 2 Boards, Cable
  • Embedded -
  • Utilized-IC-Part TMP513
  • Maximum-Operating-Temperature + 125 C
  • Minimum-Operating-Temperature - 40 C
  • Operating-Supply-Voltage 26 V
  • Tool-Is-For-Evaluation-Of TMP513

TMP513EVM

TMP513EVM Specifications

TMP513EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Temperature Sensors.

  • A: What is the Sensitivity of the product?

    Q: The Sensitivity of the product is -.

  • A: At what frequency does the Interface?

    Q: The product Interface is USB.

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is -.

  • A: At what frequency does the Sensor-Type?

    Q: The product Sensor-Type is Temperature.

  • A: At what frequency does the Sensing-Range?

    Q: The product Sensing-Range is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is 2 Boards, Cable.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TMP513

  • A: At what frequency does the Maximum-Operating-Temperature?

    Q: The product Maximum-Operating-Temperature is + 125 C.

  • A: What is the Minimum-Operating-Temperature of the product?

    Q: The Minimum-Operating-Temperature of the product is - 40 C.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 26 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TMP513

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
172,52 $
172,52 $
10
163,89 $
1 638,89 $
100
155,26 $
15 526,35 $
500
146,64 $
73 318,90 $
1000
138,01 $
138 012,00 $
Top