TMP112EVM

Mfr. #: TMP112EVM
Өндіруші: Texas Instruments
Сипаттама: Sensor Development Tools Temperature Sensor Development Tools TMP112EVM
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TMP112EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP112EVM Overview

Product belongs to the TMP112 series. This product is categorized as Evaluation Boards Type: Temperature Sensors This product is designed SM-USB-DIG amplifier. Sensitivity: ±1°C Interface: I2C Voltage Supply Range: - Temperature Sensing range of -40°C ~ 125°C Included item: 2 Boards, Cables. IC package type: TMP112 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TMP112.

TMP112EVM Image

TMP112EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP112EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series TMP112
  • Product Evaluation Boards
  • Type Temperature Sensors
  • For-Use-With SM-USB-DIG
  • Sensitivity ±1°C
  • Interface I2C
  • Voltage-Supply -
  • Sensor-Type Temperature
  • Sensing-Range -40°C ~ 125°C
  • Supplied-Contents 2 Boards, Cables
  • Embedded No
  • Utilized-IC-Part TMP112
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TMP112

TMP112EVM

TMP112EVM Specifications

TMP112EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is TMP112.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is Temperature Sensors.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is SM-USB-DIG.

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is ±1°C.

  • A: At what frequency does the Interface?

    Q: The product Interface is I2C.

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is -.

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Temperature.

  • A: Is the cutoff frequency of the product Sensing-Range?

    Q: Yes, the product's Sensing-Range is indeed -40°C ~ 125°C

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed 2 Boards, Cables

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed TMP112

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TMP112.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
148,50 $
148,50 $
10
141,08 $
1 410,75 $
100
133,65 $
13 365,00 $
500
126,22 $
63 112,50 $
1000
118,80 $
118 800,00 $
Top