TMP100EVM

Mfr. #: TMP100EVM
Өндіруші: Texas Instruments
Сипаттама: EVALUATION MODULE FOR TMP100
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TMP100EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP100EVM Overview

Product belongs to the - series. Sensitivity: ±0.5°C Interface: I2C, SMBus Voltage Supply Range: 2.7 V ~ 5.5 V Temperature Sensing range of -55°C ~ 125°C Included item: Board. IC package type: TMP100

TMP100EVM Image

TMP100EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP100EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Sensitivity ±0.5°C
  • Interface I2C, SMBus
  • Voltage-Supply 2.7 V ~ 5.5 V
  • Sensor-Type Temperature
  • Sensing-Range -55°C ~ 125°C
  • Supplied-Contents Board
  • Embedded No
  • Utilized-IC-Part TMP100

TMP100EVM

TMP100EVM Specifications

TMP100EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is ±0.5°C.

  • A: Is the cutoff frequency of the product Interface?

    Q: Yes, the product's Interface is indeed I2C, SMBus

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 2.7 V ~ 5.5 V.

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Temperature.

  • A: At what frequency does the Sensing-Range?

    Q: The product Sensing-Range is -55°C ~ 125°C.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TMP100.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
96,70 $
96,70 $
10
91,87 $
918,70 $
100
87,03 $
8 703,45 $
500
82,20 $
41 099,65 $
1000
77,36 $
77 364,00 $
Top