TMP007EVM

Mfr. #: TMP007EVM
Өндіруші: Texas Instruments
Сипаттама: Sensor Development Tools Temperature Sensor Development Tools Evaluation Module
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TMP007EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TMP007EVM Overview

Product belongs to the TMP007 series. This product is categorized as Evaluation Modules Type: IR Thermopile Sensors Bulk is the packaging method for this product Sensitivity: - Interface: I2C, SMBus Voltage Supply Range: - Temperature Sensing range of - Included item: 2 Boards. IC package type: TMP007 This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the TMP007. I2C SPI interface type

TMP007EVM Image

TMP007EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TMP007EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series TMP007
  • Product Evaluation Modules
  • Type IR Thermopile Sensors
  • Packaging Bulk
  • Sensitivity -
  • Interface I2C, SMBus
  • Voltage-Supply -
  • Sensor-Type Temperature
  • Sensing-Range -
  • Supplied-Contents 2 Boards
  • Embedded No
  • Utilized-IC-Part TMP007
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of TMP007
  • Interface-Type I2C SPI

TMP007EVM

TMP007EVM Specifications

TMP007EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is TMP007.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed IR Thermopile Sensors

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is -.

  • A: At what frequency does the Interface?

    Q: The product Interface is I2C, SMBus.

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is -.

  • A: At what frequency does the Sensor-Type?

    Q: The product Sensor-Type is Temperature.

  • A: At what frequency does the Sensing-Range?

    Q: The product Sensing-Range is -.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is 2 Boards.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TMP007.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is TMP007.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is I2C SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
65,34 $
65,34 $
10
62,07 $
620,73 $
100
58,81 $
5 880,60 $
500
55,54 $
27 769,50 $
1000
52,27 $
52 272,00 $
Top