TLK1501EVM

Mfr. #: TLK1501EVM
Өндіруші: Texas Instruments
Сипаттама: EVALUATION MOD FOR TLK1501
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TLK1501EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TLK1501EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Serializers / Deserializers The Interface, Serializer, Deserializer (SerDes) is the Main-Purpose. Primary-Attributes: - IC package type: TLK1501 This product is an TLK1501 - Interface. This tool is designed for the TLK1501.

TLK1501EVM Image

TLK1501EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLK1501EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Serializers / Deserializers
  • Main-Purpose Interface, Serializer, Deserializer (SerDes)
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TLK1501
  • Description-Function TLK1501 - Interface
  • Tool-Is-For-Evaluation-Of TLK1501

TLK1501EVM

TLK1501EVM Specifications

TLK1501EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Serializers / Deserializers.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Serializer, Deserializer (SerDes)

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TLK1501.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is TLK1501 - Interface.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed TLK1501

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
925,17 $
925,17 $
10
878,91 $
8 789,12 $
100
832,65 $
83 265,30 $
500
786,39 $
393 197,25 $
1000
740,14 $
740 136,00 $
Top