TLK10232EVM

Mfr. #: TLK10232EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MODULE FOR TLK10232
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TLK10232EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TLK10232EVM Overview

Product belongs to the TLK10232 series. This product is categorized as Evaluation Modules Type: Ethernet Transceivers This product is designed TLK10232 amplifier. The Interface, Transceiver is the Main-Purpose. Primary-Attributes: - IC package type: TLK10232 This product is an Custom-developed GUI and a detailed EVM user guide. This tool is designed for the TLK10232. GUI interface type

TLK10232EVM Image

TLK10232EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLK10232EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series TLK10232
  • Product Evaluation Modules
  • Type Ethernet Transceivers
  • For-Use-With TLK10232
  • Main-Purpose Interface, Transceiver
  • Primary-Attributes -
  • Embedded -
  • Utilized-IC-Part TLK10232
  • Description-Function Custom-developed GUI and a detailed EVM user guide
  • Tool-Is-For-Evaluation-Of TLK10232
  • Interface-Type GUI

TLK10232EVM

TLK10232EVM Specifications

TLK10232EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed TLK10232

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Ethernet Transceivers

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is TLK10232.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Interface, Transceiver

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is -.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is TLK10232.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Custom-developed GUI and a detailed EVM user guide.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is TLK10232.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is GUI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
4,00 $
4,00 $
10
4,00 $
40,00 $
100
4,00 $
400,00 $
500
3,00 $
1 500,00 $
1000
3,00 $
3 000,00 $
Top