TLC3548EVM

Mfr. #: TLC3548EVM
Өндіруші: Texas Instruments
Сипаттама: EVALUATION MODULE FOR TLC3548
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: TLC3548EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
TLC3548EVM Overview

Product belongs to the - series. This product's 200k. Data-Interface: Serial 14 bits 1 units Input range: 0 ~ 5 V Included item: Board. IC package type: TLC3548

TLC3548EVM Image

TLC3548EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

TLC3548EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series -
  • Sampling-Rate-Per-Second 200k
  • Data-Interface Serial
  • Number-of-Bits 14
  • Number-of-A-D-Converters 1
  • Input-Range 0 ~ 5 V
  • Supplied-Contents Board
  • Utilized-IC-Part TLC3548
  • Power-Typ-Conditions -

TLC3548EVM

TLC3548EVM Specifications

TLC3548EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Sampling-Rate-Per-Second?

    Q: The product Sampling-Rate-Per-Second is 200k.

  • A: What is the Data-Interface of the product?

    Q: The Data-Interface of the product is Serial.

  • A: At what frequency does the Number-of-Bits?

    Q: The product Number-of-Bits is 14.

  • A: What is the Number-of-A-D-Converters of the product?

    Q: The Number-of-A-D-Converters of the product is 1.

  • A: What is the Input-Range of the product?

    Q: The Input-Range of the product is 0 ~ 5 V.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is TLC3548.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
79,24 $
79,24 $
10
75,28 $
752,82 $
100
71,32 $
7 131,99 $
500
67,36 $
33 678,85 $
1000
63,40 $
63 395,50 $
Top