THS4601EVM

Mfr. #: THS4601EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MOD FOR THS4601
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: THS4601EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS4601EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Kits Operational temperature range: 0°C ~ 70°C Output-Type: Single-Ended Voltage supply range: 10 V ~ 30 V, ±5 V ~ 15 V The 440MHz The 100 V/μs. Current-Output-Channel is 80mA The amplifier is of General Purpose type. Included item: Board. IC package type: THS4601 Board type: Fully Populated. The product has 1 - Single channel per IC. This tool is designed for the THS4601.

THS4601EVM Image

THS4601EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS4601EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Product Evaluation Kits
  • Operating-Temperature 0°C ~ 70°C
  • Output-Type Single-Ended
  • Voltage-Supply-Single-Dual 10 V ~ 30 V, ±5 V ~ 15 V
  • -3db-Bandwidth 440MHz
  • Slew-Rate 100 V/μs
  • Current-Output-Channel 80mA
  • Amplifier-Type General Purpose
  • Supplied-Contents Board
  • Utilized-IC-Part THS4601
  • Board-Type Fully Populated
  • Channels-per-IC 1 - Single
  • Current-Supply-Main-IC 10mA
  • Tool-Is-For-Evaluation-Of THS4601

THS4601EVM

THS4601EVM Specifications

THS4601EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Kits.

  • A: Is the cutoff frequency of the product Operating-Temperature?

    Q: Yes, the product's Operating-Temperature is indeed 0°C ~ 70°C

  • A: Is the cutoff frequency of the product Output-Type?

    Q: Yes, the product's Output-Type is indeed Single-Ended

  • A: What is the Voltage-Supply-Single-Dual of the product?

    Q: The Voltage-Supply-Single-Dual of the product is 10 V ~ 30 V, ±5 V ~ 15 V.

  • A: At what frequency does the -3db-Bandwidth?

    Q: The product -3db-Bandwidth is 440MHz.

  • A: At what frequency does the Slew-Rate?

    Q: The product Slew-Rate is 100 V/μs.

  • A: At what frequency does the Current-Output-Channel?

    Q: The product Current-Output-Channel is 80mA.

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is General Purpose.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed THS4601

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: At what frequency does the Channels-per-IC?

    Q: The product Channels-per-IC is 1 - Single.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is THS4601.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
73,50 $
73,50 $
10
69,82 $
698,25 $
100
66,15 $
6 615,00 $
500
62,48 $
31 237,50 $
1000
58,80 $
58 800,00 $
Top