THS4502EVM

Mfr. #: THS4502EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MOD FOR THS4502
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: THS4502EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
THS4502EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Kits Bulk is the packaging method for this product Operational temperature range: 0°C ~ 70°C Output-Type: Differential Voltage supply range: 4.5 V ~ 15 V, ±2.25 V ~ 7.5 V The 370MHz The 2800 V/μs. Current-Output-Channel is 120mA The amplifier is of Differential type. Included item: Board. IC package type: THS4502 Board type: Fully Populated. The product has 1 - Single channel per IC. This tool is designed for the THS4502.

THS4502EVM Image

THS4502EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

THS4502EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Product Evaluation Kits
  • Packaging Bulk
  • Operating-Temperature 0°C ~ 70°C
  • Output-Type Differential
  • Voltage-Supply-Single-Dual 4.5 V ~ 15 V, ±2.25 V ~ 7.5 V
  • -3db-Bandwidth 370MHz
  • Slew-Rate 2800 V/μs
  • Current-Output-Channel 120mA
  • Amplifier-Type Differential
  • Supplied-Contents Board
  • Utilized-IC-Part THS4502
  • Board-Type Fully Populated
  • Channels-per-IC 1 - Single
  • Current-Supply-Main-IC 23mA
  • Tool-Is-For-Evaluation-Of THS4502

THS4502EVM

THS4502EVM Specifications

THS4502EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Kits

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Operating-Temperature?

    Q: Yes, the product's Operating-Temperature is indeed 0°C ~ 70°C

  • A: At what frequency does the Output-Type?

    Q: The product Output-Type is Differential.

  • A: At what frequency does the Voltage-Supply-Single-Dual?

    Q: The product Voltage-Supply-Single-Dual is 4.5 V ~ 15 V, ±2.25 V ~ 7.5 V.

  • A: At what frequency does the -3db-Bandwidth?

    Q: The product -3db-Bandwidth is 370MHz.

  • A: What is the Slew-Rate of the product?

    Q: The Slew-Rate of the product is 2800 V/μs.

  • A: At what frequency does the Current-Output-Channel?

    Q: The product Current-Output-Channel is 120mA.

  • A: At what frequency does the Amplifier-Type?

    Q: The product Amplifier-Type is Differential.

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is THS4502.

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: What is the Channels-per-IC of the product?

    Q: The Channels-per-IC of the product is 1 - Single.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is THS4502.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
56,74 $
56,74 $
10
53,91 $
539,08 $
100
51,07 $
5 107,05 $
500
48,23 $
24 116,65 $
1000
45,40 $
45 396,00 $
Top