REG710EVM-33

Mfr. #: REG710EVM-33
Өндіруші: Texas Instruments
Сипаттама: EVAL MOD FOR REG710-XX
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: REG710EVM-33 Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
REG710EVM-33 Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Charge Pumps The DC/DC, Step Up or Down is the Main-Purpose. 1.8 V ~ 5.5 V voltage input This product features 'Frequency-Switching' at 1MHz for optimal performance. Output voltage: 3.3V Buck-Boost regulator topology - Included item: Board. IC package type: REG710 Board type: Fully Populated. The product has 1, Non-Isolated outputs. Output voltage: 3.3 V This tool is designed for the REG710. Our product measures 50.8 mm x 50.8 mm in dimensions for compact and convenient use. Input Voltage Range: 1.8 V to 5.5 V

REG710EVM-33 Image

REG710EVM-33

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

REG710EVM-33 Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - DC/DC & AC/DC (Off-Line) SMPS
  • Series -
  • Product Evaluation Boards
  • Type Charge Pumps
  • Main-Purpose DC/DC, Step Up or Down
  • Voltage-Input 1.8 V ~ 5.5 V
  • Frequency-Switching 1MHz
  • Current-Output 30mA
  • Voltage-Output 3.3V
  • Regulator-Topology Buck-Boost
  • Power-Output -
  • Supplied-Contents Board
  • Utilized-IC-Part REG710
  • Board-Type Fully Populated
  • Outputs-and-Type 1, Non-Isolated
  • Output-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of REG710
  • Dimensions 50.8 mm x 50.8 mm
  • Input-Voltage 1.8 V to 5.5 V

REG710EVM-33

REG710EVM-33 Specifications

REG710EVM-33 FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Charge Pumps

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is DC/DC, Step Up or Down.

  • A: At what frequency does the Voltage-Input?

    Q: The product Voltage-Input is 1.8 V ~ 5.5 V.

  • A: Is the cutoff frequency of the product Frequency-Switching?

    Q: Yes, the product's Frequency-Switching is indeed 1MHz

  • A: At what frequency does the Voltage-Output?

    Q: The product Voltage-Output is 3.3V.

  • A: Is the cutoff frequency of the product Regulator-Topology?

    Q: Yes, the product's Regulator-Topology is indeed Buck-Boost

  • A: What is the Power-Output of the product?

    Q: The Power-Output of the product is -.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is REG710.

  • A: Is the cutoff frequency of the product Board-Type?

    Q: Yes, the product's Board-Type is indeed Fully Populated

  • A: What is the Outputs-and-Type of the product?

    Q: The Outputs-and-Type of the product is 1, Non-Isolated.

  • A: What is the Output-Voltage of the product?

    Q: The Output-Voltage of the product is 3.3 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is REG710.

  • A: Is the cutoff frequency of the product Dimensions?

    Q: Yes, the product's Dimensions is indeed 50.8 mm x 50.8 mm

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 1.8 V to 5.5 V

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
73,50 $
73,50 $
10
69,82 $
698,25 $
100
66,15 $
6 615,00 $
500
62,48 $
31 237,50 $
1000
58,80 $
58 800,00 $
Top