PCM4104EVM

Mfr. #: PCM4104EVM
Өндіруші: Texas Instruments
Сипаттама: EVALUATION MODULE FOR PCM4104
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: PCM4104EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
PCM4104EVM Overview

Type: Audio ADC Bulk is the packaging method for this product This product operates at a 5 V supply voltage for reliable performance. This tool is designed for the PCM4104.

PCM4104EVM Image

PCM4104EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

PCM4104EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Type Audio ADC
  • Packaging Bulk
  • Operating-Supply-Voltage 5 V
  • Tool-Is-For-Evaluation-Of PCM4104

PCM4104EVM

PCM4104EVM Specifications

PCM4104EVM FAQ
  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio ADC

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 5 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed PCM4104

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
38,25 $
38,25 $
10
36,34 $
363,38 $
100
34,42 $
3 442,50 $
500
32,51 $
16 256,25 $
1000
30,60 $
30 600,00 $
Top