OPA547EVM

Mfr. #: OPA547EVM
Өндіруші: Texas Instruments
Сипаттама: EVALUATION MODULE
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: OPA547EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
OPA547EVM Overview

This product is categorized as Evaluation Modules Type: Operational Amplifiers This product operates at a 60 V supply voltage for reliable performance. This tool is designed for the OPA547.

OPA547EVM Image

OPA547EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

OPA547EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Product Evaluation Modules
  • Type Operational Amplifiers
  • Operating-Supply-Voltage 60 V
  • Tool-Is-For-Evaluation-Of OPA547

OPA547EVM

OPA547EVM Specifications

OPA547EVM FAQ
  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Operational Amplifiers

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 60 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed OPA547

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
298,50 $
298,50 $
10
283,58 $
2 835,75 $
100
268,65 $
26 865,00 $
500
253,72 $
126 862,50 $
1000
238,80 $
238 800,00 $
Top