OPA3695EVM

Mfr. #: OPA3695EVM
Өндіруші: Texas Instruments
Сипаттама: EVALUATION MODULE FOR OPA3695
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: OPA3695EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
OPA3695EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Operational Amplifiers Operational temperature range: -40°C ~ 85°C Output-Type: Single-Ended Voltage supply range: 5 V ~ 12 V, ±2.5 V ~ 6 V The 1GHz The 4300 V/μs. Current-Output-Channel is 120mA The amplifier is of Current Feedback type. Included item: Board. IC package type: OPA3695 Board type: Fully Populated. The product has 3 - Triple channel per IC. This product operates at a 5 V supply voltage for reliable performance. This product is an The OPA3695EVM is designed to quickly and easily demonstrate the functionality and versatility of the amplifier. This tool is designed for the OPA3695. 12.9 mA is 92 nA.

OPA3695EVM Image

OPA3695EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

OPA3695EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Op Amps
  • Series -
  • Product Evaluation Modules
  • Type Operational Amplifiers
  • Operating-Temperature -40°C ~ 85°C
  • Output-Type Single-Ended
  • Voltage-Supply-Single-Dual 5 V ~ 12 V, ±2.5 V ~ 6 V
  • -3db-Bandwidth 1GHz
  • Slew-Rate 4300 V/μs
  • Current-Output-Channel 120mA
  • Amplifier-Type Current Feedback
  • Supplied-Contents Board
  • Utilized-IC-Part OPA3695
  • Board-Type Fully Populated
  • Channels-per-IC 3 - Triple
  • Current-Supply-Main-IC 12.9mA
  • Operating-Supply-Voltage 5 V
  • Description-Function The OPA3695EVM is designed to quickly and easily demonstrate the functionality and versatility of the amplifier
  • Tool-Is-For-Evaluation-Of OPA3695
  • Operating-Supply-Current 12.9 mA

OPA3695EVM

OPA3695EVM Specifications

OPA3695EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Operational Amplifiers.

  • A: Is the cutoff frequency of the product Operating-Temperature?

    Q: Yes, the product's Operating-Temperature is indeed -40°C ~ 85°C

  • A: What is the Output-Type of the product?

    Q: The Output-Type of the product is Single-Ended.

  • A: At what frequency does the Voltage-Supply-Single-Dual?

    Q: The product Voltage-Supply-Single-Dual is 5 V ~ 12 V, ±2.5 V ~ 6 V.

  • A: At what frequency does the -3db-Bandwidth?

    Q: The product -3db-Bandwidth is 1GHz.

  • A: What is the Slew-Rate of the product?

    Q: The Slew-Rate of the product is 4300 V/μs.

  • A: Is the cutoff frequency of the product Current-Output-Channel?

    Q: Yes, the product's Current-Output-Channel is indeed 120mA

  • A: What is the Amplifier-Type of the product?

    Q: The Amplifier-Type of the product is Current Feedback.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed OPA3695

  • A: At what frequency does the Board-Type?

    Q: The product Board-Type is Fully Populated.

  • A: At what frequency does the Channels-per-IC?

    Q: The product Channels-per-IC is 3 - Triple.

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 5 V.

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed The OPA3695EVM is designed to quickly and easily demonstrate the functionality and versatility of the amplifier

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed OPA3695

  • A: Is the cutoff frequency of the product Operating-Supply-Current?

    Q: Yes, the product's Operating-Supply-Current is indeed 12.9 mA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
114,63 $
114,63 $
10
108,90 $
1 088,98 $
100
103,17 $
10 316,70 $
500
97,44 $
48 717,75 $
1000
91,70 $
91 704,00 $
Top