LMX2492EVM

Mfr. #: LMX2492EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL BOARD PLL WITH VCO LMX2492
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: LMX2492EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LMX2492EVM Overview

Product belongs to the LMX2492 series. This product is categorized as Evaluation Boards Type: Frequency Synthesizers Bulk is the packaging method for this product This product's 5 GHz 10 GHz range is 0Hz to 2.2GHz. The Timing, PLL is the Main-Purpose. Primary-Attributes: Single Fractional-N PLL with VCO IC package type: LMX2492 This product operates at a 3 V 5 V supply voltage for reliable performance. This tool is designed for the LMX2492. SMA interface type

LMX2492EVM Image

LMX2492EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMX2492EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series LMX2492
  • Product Evaluation Boards
  • Type Frequency Synthesizers
  • Packaging Bulk
  • Frequency 5 GHz 10 GHz
  • Main-Purpose Timing, PLL
  • Primary-Attributes Single Fractional-N PLL with VCO
  • Embedded -
  • Utilized-IC-Part LMX2492
  • Operating-Supply-Voltage 3 V 5 V
  • Tool-Is-For-Evaluation-Of LMX2492
  • Interface-Type SMA

LMX2492EVM

LMX2492EVM Specifications

LMX2492EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is LMX2492.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Frequency Synthesizers

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Frequency?

    Q: Yes, the product's Frequency is indeed 5 GHz 10 GHz

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Timing, PLL.

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is Single Fractional-N PLL with VCO.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is LMX2492.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3 V 5 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed LMX2492

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SMA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
457,36 $
457,36 $
10
434,50 $
4 344,97 $
100
411,63 $
41 162,85 $
500
388,76 $
194 380,15 $
1000
365,89 $
365 892,00 $
Top