| Mfr. #: | LMT88-9EVM |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | Sensor Development Tools Temperature Sensor Development Tools LMT88-9EVM Temp Sensor EVM |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | LMT88-9EVM Деректер тізімі |


Product belongs to the - series. This product is categorized as Evaluation Modules Type: Temperature Sensors Bulk is the packaging method for this product Sensitivity: ±1.5°C Interface: Analog Voltage Supply Range: 2.7 V ~ 5.5 V Temperature Sensing range of -55°C ~ 130°C Included item: Board. IC package type: LMT88, LMT89 Maximum operating temperature of + 130 C Minimum operating temperature: - 55 C This product operates at a 2.4 V to 5.5 V supply voltage for reliable performance. This tool is designed for the LMT88 LMT89.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMT88-9EVM Specifications
A: At what frequency does the Series?
Q: The product Series is -.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Temperature Sensors
A: At what frequency does the Packaging?
Q: The product Packaging is Bulk.
A: What is the Sensitivity of the product?
Q: The Sensitivity of the product is ±1.5°C.
A: Is the cutoff frequency of the product Interface?
Q: Yes, the product's Interface is indeed Analog
A: Is the cutoff frequency of the product Voltage-Supply?
Q: Yes, the product's Voltage-Supply is indeed 2.7 V ~ 5.5 V
A: At what frequency does the Sensor-Type?
Q: The product Sensor-Type is Temperature.
A: Is the cutoff frequency of the product Sensing-Range?
Q: Yes, the product's Sensing-Range is indeed -55°C ~ 130°C
A: At what frequency does the Supplied-Contents?
Q: The product Supplied-Contents is Board.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed LMT88, LMT89
A: Is the cutoff frequency of the product Maximum-Operating-Temperature?
Q: Yes, the product's Maximum-Operating-Temperature is indeed + 130 C
A: Is the cutoff frequency of the product Minimum-Operating-Temperature?
Q: Yes, the product's Minimum-Operating-Temperature is indeed - 55 C
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 2.4 V to 5.5 V.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed LMT88 LMT89