| Mfr. #: | LMT01EVM |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | EVAL BOARD FOR LMT01 |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | LMT01EVM Деректер тізімі |


Product belongs to the - series. This product is categorized as Evaluation Modules Type: Temperature Sensors Bulk is the packaging method for this product Sensitivity: ±0.5°C Interface: Digital Voltage Supply Range: 5V, USB Temperature Sensing range of -50°C ~ 150°C Included item: Board. IC package type: LMT01 Maximum operating temperature of + 150 C Minimum operating temperature: - 50 C This product operates at a 5.5 V supply voltage for reliable performance. This tool is designed for the LMT01. 1-Wire interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LMT01EVM Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed -
A: What is the Product of the product?
Q: The Product of the product is Evaluation Modules.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Temperature Sensors
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: At what frequency does the Sensitivity?
Q: The product Sensitivity is ±0.5°C.
A: What is the Interface of the product?
Q: The Interface of the product is Digital.
A: What is the Voltage-Supply of the product?
Q: The Voltage-Supply of the product is 5V, USB.
A: At what frequency does the Sensor-Type?
Q: The product Sensor-Type is Temperature.
A: At what frequency does the Sensing-Range?
Q: The product Sensing-Range is -50°C ~ 150°C.
A: Is the cutoff frequency of the product Supplied-Contents?
Q: Yes, the product's Supplied-Contents is indeed Board
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is LMT01.
A: At what frequency does the Maximum-Operating-Temperature?
Q: The product Maximum-Operating-Temperature is + 150 C.
A: What is the Minimum-Operating-Temperature of the product?
Q: The Minimum-Operating-Temperature of the product is - 50 C.
A: Is the cutoff frequency of the product Operating-Supply-Voltage?
Q: Yes, the product's Operating-Supply-Voltage is indeed 5.5 V
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is LMT01.
A: What is the Interface-Type of the product?
Q: The Interface-Type of the product is 1-Wire.