LM57EVM

Mfr. #: LM57EVM
Өндіруші: Texas Instruments
Сипаттама: Sensor Development Tools Temperature Sensor Development Tools LM57 EVAL MOD
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: LM57EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LM57EVM Overview

Product belongs to the LM57 series. This product is categorized as Evaluation Modules Type: Temperature Sensors Bulk is the packaging method for this product Sensitivity: ±1.5°C Interface: Analog Voltage Supply Range: 2.4 V ~ 5.5 V Temperature Sensing range of -50°C ~ 150°C Included item: Board. IC package type: LM57 This tool is designed for the LM57.

LM57EVM Image

LM57EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LM57EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series LM57
  • Product Evaluation Modules
  • Type Temperature Sensors
  • Packaging Bulk
  • Sensitivity ±1.5°C
  • Interface Analog
  • Voltage-Supply 2.4 V ~ 5.5 V
  • Sensor-Type Temperature
  • Sensing-Range -50°C ~ 150°C
  • Supplied-Contents Board
  • Embedded No
  • Utilized-IC-Part LM57
  • Tool-Is-For-Evaluation-Of LM57

LM57EVM

LM57EVM Specifications

LM57EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed LM57

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Temperature Sensors.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Sensitivity of the product?

    Q: The Sensitivity of the product is ±1.5°C.

  • A: At what frequency does the Interface?

    Q: The product Interface is Analog.

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 2.4 V ~ 5.5 V.

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Temperature.

  • A: At what frequency does the Sensing-Range?

    Q: The product Sensing-Range is -50°C ~ 150°C.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed LM57

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is LM57.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
43,50 $
43,50 $
10
41,32 $
413,25 $
100
39,15 $
3 915,00 $
500
36,98 $
18 487,50 $
1000
34,80 $
34 800,00 $
Top