LDC1312EVM

Mfr. #: LDC1312EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MODULE FOR LDC1312
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: LDC1312EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LDC1312EVM Overview

Product belongs to the LDC1312 series. This product is categorized as Evaluation Modules Type: Inductance to Digital Bulk is the packaging method for this product Sensitivity: - Interface: USB Voltage Supply Range: 5V, USB Proximity, Inductive Sensing range of - Included item: Board. IC package type: LDC1312 This tool is designed for the LCD1312.

LDC1312EVM Image

LDC1312EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LDC1312EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series LDC1312
  • Product Evaluation Modules
  • Type Inductance to Digital
  • Packaging Bulk
  • Sensitivity -
  • Interface USB
  • Voltage-Supply 5V, USB
  • Sensor-Type Proximity, Inductive
  • Sensing-Range -
  • Supplied-Contents Board
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part LDC1312
  • Tool-Is-For-Evaluation-Of LCD1312

LDC1312EVM

LDC1312EVM Specifications

LDC1312EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is LDC1312.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Inductance to Digital

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Sensitivity?

    Q: Yes, the product's Sensitivity is indeed -

  • A: What is the Interface of the product?

    Q: The Interface of the product is USB.

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is 5V, USB.

  • A: Is the cutoff frequency of the product Sensor-Type?

    Q: Yes, the product's Sensor-Type is indeed Proximity, Inductive

  • A: Is the cutoff frequency of the product Sensing-Range?

    Q: Yes, the product's Sensing-Range is indeed -

  • A: What is the Supplied-Contents of the product?

    Q: The Supplied-Contents of the product is Board.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed LDC1312

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is LCD1312.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
33,57 $
33,57 $
10
31,89 $
318,92 $
100
30,21 $
3 021,30 $
500
28,53 $
14 267,25 $
1000
26,86 $
26 856,00 $
Top