LDC1051EVM

Mfr. #: LDC1051EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL BOARD INDUCTIVE TO DGTL
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: LDC1051EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
LDC1051EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: ADC and DAC Bulk is the packaging method for this product This product is designed LDC10xx amplifier. Sensitivity: - Interface: USB Voltage Supply Range: 5V, USB Proximity, Inductive Sensing range of - Included item: Board. IC package type: LDC1051 This product is an Evaluation module for LDC10xx. This tool is designed for the LDC10xx. SPI USB interface type

LDC1051EVM Image

LDC1051EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LDC1051EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Sensors
  • Series -
  • Product Evaluation Modules
  • Type ADC and DAC
  • Packaging Bulk
  • For-Use-With LDC10xx
  • Sensitivity -
  • Interface USB
  • Voltage-Supply 5V, USB
  • Sensor-Type Proximity, Inductive
  • Sensing-Range -
  • Supplied-Contents Board
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part LDC1051
  • Description-Function Evaluation module for LDC10xx
  • Tool-Is-For-Evaluation-Of LDC10xx
  • Interface-Type SPI USB

LDC1051EVM

LDC1051EVM Specifications

LDC1051EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed ADC and DAC

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed LDC10xx

  • A: At what frequency does the Sensitivity?

    Q: The product Sensitivity is -.

  • A: At what frequency does the Interface?

    Q: The product Interface is USB.

  • A: What is the Voltage-Supply of the product?

    Q: The Voltage-Supply of the product is 5V, USB.

  • A: What is the Sensor-Type of the product?

    Q: The Sensor-Type of the product is Proximity, Inductive.

  • A: What is the Sensing-Range of the product?

    Q: The Sensing-Range of the product is -.

  • A: At what frequency does the Supplied-Contents?

    Q: The product Supplied-Contents is Board.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is LDC1051.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Evaluation module for LDC10xx.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is LDC10xx.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is SPI USB.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
33,60 $
33,60 $
10
31,92 $
319,20 $
100
30,24 $
3 024,00 $
500
28,56 $
14 280,00 $
1000
26,88 $
26 880,00 $
Top