| Mfr. #: | LDC1000EVM |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | EVAL BOARD FOR LDC1000 |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | LDC1000EVM Деректер тізімі |


Product belongs to the LDC1000 series. This product is categorized as Evaluation Modules Type: Inductance to Digital Bulk is the packaging method for this product This product is designed LDC1000 amplifier. Sensitivity: - Interface: USB Voltage Supply Range: 5V, USB Proximity, Inductive Sensing range of - Included item: Board. IC package type: LDC1000 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product operates at a 5 V supply voltage for reliable performance. This product is an Designed to provide an example LC tank and coil structure application to interface to a host computer. This tool is designed for the LDC1000. 1.7 mA is 92 nA. USB interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

LDC1000EVM Specifications
A: At what frequency does the Series?
Q: The product Series is LDC1000.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is Inductance to Digital.
A: What is the Packaging of the product?
Q: The Packaging of the product is Bulk.
A: What is the For-Use-With of the product?
Q: The For-Use-With of the product is LDC1000.
A: At what frequency does the Sensitivity?
Q: The product Sensitivity is -.
A: What is the Interface of the product?
Q: The Interface of the product is USB.
A: At what frequency does the Voltage-Supply?
Q: The product Voltage-Supply is 5V, USB.
A: What is the Sensor-Type of the product?
Q: The Sensor-Type of the product is Proximity, Inductive.
A: At what frequency does the Sensing-Range?
Q: The product Sensing-Range is -.
A: What is the Supplied-Contents of the product?
Q: The Supplied-Contents of the product is Board.
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is LDC1000.
A: What is the Maximum-Operating-Temperature of the product?
Q: The Maximum-Operating-Temperature of the product is + 125 C.
A: At what frequency does the Minimum-Operating-Temperature?
Q: The product Minimum-Operating-Temperature is - 40 C.
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 5 V.
A: At what frequency does the Description-Function?
Q: The product Description-Function is Designed to provide an example LC tank and coil structure application to interface to a host computer.
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is LDC1000.
A: Is the cutoff frequency of the product Operating-Supply-Current?
Q: Yes, the product's Operating-Supply-Current is indeed 1.7 mA
A: Is the cutoff frequency of the product Interface-Type?
Q: Yes, the product's Interface-Type is indeed USB