| Mfr. #: | INA225EVM |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | EVAL MOD FOR CURRENT SHUNT MON |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | INA225EVM Деректер тізімі |


Product belongs to the INA225 series. This product is categorized as Evaluation Modules Type: Current Sense Bulk is the packaging method for this product This product is designed INA225 amplifier. The Power Management, Current Monitor is the Main-Purpose. Primary-Attributes: Current Shunt Monitor IC package type: INA225 Maximum operating temperature of + 125 C Minimum operating temperature: - 40 C This product operates at a 0 V to 36 V supply voltage for reliable performance. This product is an INA225 evaluation module for 36 V programmable gain. This tool is designed for the INA225. 0.35 mA is 92 nA.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

INA225EVM Specifications
A: At what frequency does the Series?
Q: The product Series is INA225.
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: At what frequency does the Type?
Q: The product Type is Current Sense.
A: At what frequency does the Packaging?
Q: The product Packaging is Bulk.
A: At what frequency does the For-Use-With?
Q: The product For-Use-With is INA225.
A: What is the Main-Purpose of the product?
Q: The Main-Purpose of the product is Power Management, Current Monitor.
A: What is the Primary-Attributes of the product?
Q: The Primary-Attributes of the product is Current Shunt Monitor.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed INA225
A: What is the Maximum-Operating-Temperature of the product?
Q: The Maximum-Operating-Temperature of the product is + 125 C.
A: What is the Minimum-Operating-Temperature of the product?
Q: The Minimum-Operating-Temperature of the product is - 40 C.
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 0 V to 36 V.
A: What is the Description-Function of the product?
Q: The Description-Function of the product is INA225 evaluation module for 36 V programmable gain.
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is INA225.
A: What is the Operating-Supply-Current of the product?
Q: The Operating-Supply-Current of the product is 0.35 mA.