DRV8860EVM

Mfr. #: DRV8860EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MODULE FOR DRV8860
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DRV8860EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8860EVM Overview

Product belongs to the DRV8860 series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product This product is designed MSP430F2350 amplifier. The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: - IC package type: DRV8860 Output voltage: - This product is an Evaluation module for octal low side driver with serial interface. This tool is designed for the DRV8860. Serial UART USB interface type Our product measures 101 mm x 60 mm in dimensions for compact and convenient use. Input Voltage Range: 8 V to 38 V

DRV8860EVM Image

DRV8860EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8860EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series DRV8860
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Packaging Bulk
  • For-Use-With MSP430F2350
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes -
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part DRV8860
  • Output-Voltage -
  • Description-Function Evaluation module for octal low side driver with serial interface
  • Tool-Is-For-Evaluation-Of DRV8860
  • Interface-Type Serial UART USB
  • Dimensions 101 mm x 60 mm
  • Input-Voltage 8 V to 38 V

DRV8860EVM

DRV8860EVM Specifications

DRV8860EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is DRV8860.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Motor / Motion Controllers & Drivers.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is MSP430F2350.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is -.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is DRV8860.

  • A: What is the Output-Voltage of the product?

    Q: The Output-Voltage of the product is -.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Evaluation module for octal low side driver with serial interface.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DRV8860.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is Serial UART USB.

  • A: What is the Dimensions of the product?

    Q: The Dimensions of the product is 101 mm x 60 mm.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 8 V to 38 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
114,63 $
114,63 $
10
108,90 $
1 088,98 $
100
103,17 $
10 316,70 $
500
97,44 $
48 717,75 $
1000
91,70 $
91 704,00 $
Top