DRV8846EVM

Mfr. #: DRV8846EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL BOARD FOR DRV8846
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DRV8846EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8846EVM Overview

Product belongs to the DRV8846 series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product This product is designed DRV8846 amplifier. The Power Management, Motor Control, Stepper is the Main-Purpose. Primary-Attributes: Dual Full-Bridge (H-Bridge) Driver IC package type: DRV8846 This product is an Evaluation board for dual H-bridge stepper motor driver. This tool is designed for the DRV8846. USB interface type Input Voltage Range: 4 V to 18 V

DRV8846EVM Image

DRV8846EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8846EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series DRV8846
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Packaging Bulk
  • For-Use-With DRV8846
  • Main-Purpose Power Management, Motor Control, Stepper
  • Primary-Attributes Dual Full-Bridge (H-Bridge) Driver
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part DRV8846
  • Description-Function Evaluation board for dual H-bridge stepper motor driver
  • Tool-Is-For-Evaluation-Of DRV8846
  • Interface-Type USB
  • Input-Voltage 4 V to 18 V

DRV8846EVM

DRV8846EVM Specifications

DRV8846EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is DRV8846.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: What is the Type of the product?

    Q: The Type of the product is Motor / Motion Controllers & Drivers.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the For-Use-With?

    Q: The product For-Use-With is DRV8846.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control, Stepper

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed Dual Full-Bridge (H-Bridge) Driver

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is DRV8846.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Evaluation board for dual H-bridge stepper motor driver.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DRV8846.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is USB.

  • A: At what frequency does the Input-Voltage?

    Q: The product Input-Voltage is 4 V to 18 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
73,50 $
73,50 $
10
69,82 $
698,25 $
100
66,15 $
6 615,00 $
500
62,48 $
31 237,50 $
1000
58,80 $
58 800,00 $
Top