DRV8837EVM

Mfr. #: DRV8837EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MODULE FOR DRV8837
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DRV8837EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8837EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: Single-H-Bridge Driver IC package type: DRV8837 This tool is designed for the DRV8837. Input Voltage Range: 1.8 V to 11 V Output current: 1.8 A

DRV8837EVM Image

DRV8837EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8837EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Packaging Bulk
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes Single-H-Bridge Driver
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part DRV8837
  • Tool-Is-For-Evaluation-Of DRV8837
  • Input-Voltage 1.8 V to 11 V
  • Output-Current 1.8 A

DRV8837EVM

DRV8837EVM Specifications

DRV8837EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Motor / Motion Controllers & Drivers

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed Single-H-Bridge Driver

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is DRV8837.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DRV8837.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 1.8 V to 11 V

  • A: At what frequency does the Output-Current?

    Q: The product Output-Current is 1.8 A.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
37,50 $
37,50 $
10
35,62 $
356,25 $
100
33,75 $
3 375,00 $
500
31,88 $
15 937,50 $
1000
30,00 $
30 000,00 $
Top