DRV8824EVM

Mfr. #: DRV8824EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MODULE FOR DRV8824
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DRV8824EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8824EVM Overview

Product belongs to the - series. This product is categorized as Development Tools Bulk is the packaging method for this product The Power Management, Motor Control, Stepper is the Main-Purpose. Primary-Attributes: - IC package type: DRV8824 This product is an Evaluation Module. This tool is designed for the DRV8824.

DRV8824EVM Image

DRV8824EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8824EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Development Tools
  • Packaging Bulk
  • Main-Purpose Power Management, Motor Control, Stepper
  • Primary-Attributes -
  • Embedded No
  • Utilized-IC-Part DRV8824
  • Description-Function Evaluation Module
  • Tool-Is-For-Evaluation-Of DRV8824

DRV8824EVM

DRV8824EVM Specifications

DRV8824EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Development Tools.

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: At what frequency does the Main-Purpose?

    Q: The product Main-Purpose is Power Management, Motor Control, Stepper.

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed -

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed DRV8824

  • A: Is the cutoff frequency of the product Description-Function?

    Q: Yes, the product's Description-Function is indeed Evaluation Module

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV8824

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
172,52 $
172,52 $
10
163,89 $
1 638,89 $
100
155,26 $
15 526,35 $
500
146,64 $
73 318,90 $
1000
138,01 $
138 012,00 $
Top