DRV8806EVM

Mfr. #: DRV8806EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MODULE FOR DRV8806
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DRV8806EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8806EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: 4 Channel Low-Side Driver IC package type: DRV8806 Output voltage: 40 V This tool is designed for the DRV8806. Input Voltage Range: 8.2 V to 40 V Output current: 2 A

DRV8806EVM Image

DRV8806EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8806EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes 4 Channel Low-Side Driver
  • Embedded Yes, MCU, 16-Bit
  • Utilized-IC-Part DRV8806
  • Output-Voltage 40 V
  • Tool-Is-For-Evaluation-Of DRV8806
  • Input-Voltage 8.2 V to 40 V
  • Output-Current 2 A

DRV8806EVM

DRV8806EVM Specifications

DRV8806EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Modules.

  • A: What is the Type of the product?

    Q: The Type of the product is Motor / Motion Controllers & Drivers.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is 4 Channel Low-Side Driver.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is DRV8806.

  • A: At what frequency does the Output-Voltage?

    Q: The product Output-Voltage is 40 V.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DRV8806.

  • A: Is the cutoff frequency of the product Input-Voltage?

    Q: Yes, the product's Input-Voltage is indeed 8.2 V to 40 V

  • A: Is the cutoff frequency of the product Output-Current?

    Q: Yes, the product's Output-Current is indeed 2 A

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
114,63 $
114,63 $
10
108,90 $
1 088,98 $
100
103,17 $
10 316,70 $
500
97,44 $
48 717,75 $
1000
91,70 $
91 704,00 $
Top