DRV8307EVM

Mfr. #: DRV8307EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL BOARD MOTOR DRIVER DRV8307
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DRV8307EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV8307EVM Overview

Product belongs to the DRV8307 series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers Bulk is the packaging method for this product This product is designed DRV8307 amplifier. The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: Brushless DC (BLDC) Motors IC package type: DRV8307 Output voltage: 5 V This product is an Solution for evaluating the DRV8307 a brushless DC motor controller. This tool is designed for the DRV8307. Input Voltage Range: 8.5 V Output current: 30 mA

DRV8307EVM Image

DRV8307EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV8307EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series DRV8307
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Packaging Bulk
  • For-Use-With DRV8307
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes Brushless DC (BLDC) Motors
  • Embedded -
  • Utilized-IC-Part DRV8307
  • Output-Voltage 5 V
  • Description-Function Solution for evaluating the DRV8307 a brushless DC motor controller
  • Tool-Is-For-Evaluation-Of DRV8307
  • Input-Voltage 8.5 V
  • Output-Current 30 mA

DRV8307EVM

DRV8307EVM Specifications

DRV8307EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is DRV8307.

  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Modules

  • A: At what frequency does the Type?

    Q: The product Type is Motor / Motion Controllers & Drivers.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product For-Use-With?

    Q: Yes, the product's For-Use-With is indeed DRV8307

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is Brushless DC (BLDC) Motors.

  • A: Is the cutoff frequency of the product Utilized-IC-Part?

    Q: Yes, the product's Utilized-IC-Part is indeed DRV8307

  • A: What is the Output-Voltage of the product?

    Q: The Output-Voltage of the product is 5 V.

  • A: At what frequency does the Description-Function?

    Q: The product Description-Function is Solution for evaluating the DRV8307 a brushless DC motor controller.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DRV8307.

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 8.5 V.

  • A: What is the Output-Current of the product?

    Q: The Output-Current of the product is 30 mA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
86,85 $
86,85 $
10
82,51 $
825,08 $
100
78,16 $
7 816,50 $
500
73,82 $
36 911,25 $
1000
69,48 $
69 480,00 $
Top