DRV632EVM

Mfr. #: DRV632EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MODULE FOR DRV632
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DRV632EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV632EVM Overview

Product belongs to the DirectPath series. This product is categorized as Evaluation Modules Type: Audio Amplifiers Bulk is the packaging method for this product Output-Type: 2-Channel (Stereo) Voltage Supply Range: 3 V ~ 3.6 V Maximum Output Power of - for 1 channel The amplifier is of Class AB type. Included item: Board. IC package type: DRV632 Board type: Fully Populated. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the DRV632. 25 mA is 92 nA.

DRV632EVM Image

DRV632EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV632EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Audio Amplifiers
  • Series DirectPath
  • Product Evaluation Modules
  • Type Audio Amplifiers
  • Packaging Bulk
  • Output-Type 2-Channel (Stereo)
  • Voltage-Supply 3 V ~ 3.6 V
  • Max-Output-Power-x-Channels-Load -
  • Amplifier-Type Class AB
  • Supplied-Contents Board
  • Utilized-IC-Part DRV632
  • Board-Type Fully Populated
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of DRV632
  • Operating-Supply-Current 25 mA

DRV632EVM

DRV632EVM Specifications

DRV632EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed DirectPath

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Audio Amplifiers

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Output-Type?

    Q: Yes, the product's Output-Type is indeed 2-Channel (Stereo)

  • A: At what frequency does the Voltage-Supply?

    Q: The product Voltage-Supply is 3 V ~ 3.6 V.

  • A: At what frequency does the Max-Output-Power-x-Channels-Load?

    Q: The product Max-Output-Power-x-Channels-Load is -.

  • A: At what frequency does the Amplifier-Type?

    Q: The product Amplifier-Type is Class AB.

  • A: Is the cutoff frequency of the product Supplied-Contents?

    Q: Yes, the product's Supplied-Contents is indeed Board

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is DRV632.

  • A: What is the Board-Type of the product?

    Q: The Board-Type of the product is Fully Populated.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DRV632.

  • A: What is the Operating-Supply-Current of the product?

    Q: The Operating-Supply-Current of the product is 25 mA.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
114,63 $
114,63 $
10
108,90 $
1 088,98 $
100
103,17 $
10 316,70 $
500
97,44 $
48 717,75 $
1000
91,70 $
91 704,00 $
Top