| Mfr. #: | DRV602EVM2 |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | EVAL MODULE FOR DRV602 |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | DRV602EVM2 Деректер тізімі |


Product belongs to the DirectPath series. Type: Audio Amplifiers Output-Type: 2-Channel (Stereo) Voltage Supply Range: 3 V ~ 5.5 V Maximum Output Power of - for 1 channel The amplifier is of Class AB type. Included item: Board. IC package type: DRV602 Board type: Fully Populated. This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the DRV602.

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV602EVM2 Specifications
A: What is the Series of the product?
Q: The Series of the product is DirectPath.
A: Is the cutoff frequency of the product Type?
Q: Yes, the product's Type is indeed Audio Amplifiers
A: At what frequency does the Output-Type?
Q: The product Output-Type is 2-Channel (Stereo).
A: What is the Voltage-Supply of the product?
Q: The Voltage-Supply of the product is 3 V ~ 5.5 V.
A: What is the Max-Output-Power-x-Channels-Load of the product?
Q: The Max-Output-Power-x-Channels-Load of the product is -.
A: What is the Amplifier-Type of the product?
Q: The Amplifier-Type of the product is Class AB.
A: Is the cutoff frequency of the product Supplied-Contents?
Q: Yes, the product's Supplied-Contents is indeed Board
A: What is the Utilized-IC-Part of the product?
Q: The Utilized-IC-Part of the product is DRV602.
A: What is the Board-Type of the product?
Q: The Board-Type of the product is Fully Populated.
A: What is the Operating-Supply-Voltage of the product?
Q: The Operating-Supply-Voltage of the product is 3.3 V.
A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?
Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DRV602