DRV591EVM

Mfr. #: DRV591EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MOD FOR DRV591
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DRV591EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV591EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Gate Drivers Bulk is the packaging method for this product The Power Management, Half H-Bridge Driver (Internal FET) is the Main-Purpose. Primary-Attributes: +/-3A, 2.8 ~ 5.5V, Driver for Thermoelectric Cooler (TEC) or Laser Diode IC package type: DRV591 This tool is designed for the DRV591VFP. Input Voltage Range: 2.8 V to 5.5 V

DRV591EVM Image

DRV591EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV591EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Gate Drivers
  • Packaging Bulk
  • Main-Purpose Power Management, Half H-Bridge Driver (Internal FET)
  • Primary-Attributes +/-3A, 2.8 ~ 5.5V, Driver for Thermoelectric Cooler (TEC) or Laser Diode
  • Embedded No
  • Utilized-IC-Part DRV591
  • Tool-Is-For-Evaluation-Of DRV591VFP
  • Input-Voltage 2.8 V to 5.5 V

DRV591EVM

DRV591EVM Specifications

DRV591EVM FAQ
  • A: Is the cutoff frequency of the product Series?

    Q: Yes, the product's Series is indeed -

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Gate Drivers

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Half H-Bridge Driver (Internal FET)

  • A: What is the Primary-Attributes of the product?

    Q: The Primary-Attributes of the product is +/-3A, 2.8 ~ 5.5V, Driver for Thermoelectric Cooler (TEC) or Laser Diode.

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is DRV591.

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DRV591VFP.

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 2.8 V to 5.5 V.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
19,04 $
19,04 $
10
18,08 $
180,83 $
100
17,13 $
1 713,15 $
500
16,18 $
8 089,90 $
1000
15,23 $
15 228,00 $
Top