DRV201EVM

Mfr. #: DRV201EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MODULE FOR DRV201
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DRV201EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DRV201EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Modules Type: Motor / Motion Controllers & Drivers The Power Management, Motor Control is the Main-Purpose. Primary-Attributes: Voice Coil Motor Driver for Camera Auto Focus IC package type: DRV201 Maximum operating temperature of + 85 C Minimum operating temperature: - 40 C Output voltage: - This tool is designed for the DRV201. I2C interface type Input Voltage Range: 2.5 V to 4.8 V Output current: 102.3 mA

DRV201EVM Image

DRV201EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV201EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Modules
  • Type Motor / Motion Controllers & Drivers
  • Main-Purpose Power Management, Motor Control
  • Primary-Attributes Voice Coil Motor Driver for Camera Auto Focus
  • Embedded No
  • Utilized-IC-Part DRV201
  • Maximum-Operating-Temperature + 85 C
  • Minimum-Operating-Temperature - 40 C
  • Output-Voltage -
  • Tool-Is-For-Evaluation-Of DRV201
  • Interface-Type I2C
  • Input-Voltage 2.5 V to 4.8 V
  • Output-Current 102.3 mA

DRV201EVM

DRV201EVM Specifications

DRV201EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Modules.

  • A: At what frequency does the Type?

    Q: The product Type is Motor / Motion Controllers & Drivers.

  • A: Is the cutoff frequency of the product Main-Purpose?

    Q: Yes, the product's Main-Purpose is indeed Power Management, Motor Control

  • A: Is the cutoff frequency of the product Primary-Attributes?

    Q: Yes, the product's Primary-Attributes is indeed Voice Coil Motor Driver for Camera Auto Focus

  • A: At what frequency does the Utilized-IC-Part?

    Q: The product Utilized-IC-Part is DRV201.

  • A: What is the Maximum-Operating-Temperature of the product?

    Q: The Maximum-Operating-Temperature of the product is + 85 C.

  • A: At what frequency does the Minimum-Operating-Temperature?

    Q: The product Minimum-Operating-Temperature is - 40 C.

  • A: Is the cutoff frequency of the product Output-Voltage?

    Q: Yes, the product's Output-Voltage is indeed -

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DRV201.

  • A: What is the Interface-Type of the product?

    Q: The Interface-Type of the product is I2C.

  • A: What is the Input-Voltage of the product?

    Q: The Input-Voltage of the product is 2.5 V to 4.8 V.

  • A: Is the cutoff frequency of the product Output-Current?

    Q: Yes, the product's Output-Current is indeed 102.3 mA

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
86,85 $
86,85 $
10
82,51 $
825,08 $
100
78,16 $
7 816,50 $
500
73,82 $
36 911,25 $
1000
69,48 $
69 480,00 $
Top