| Mfr. #: | DRV110EVM |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | EVAL MODULE FOR DRV110 |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | DRV110EVM Деректер тізімі |


Product belongs to the DRV110 series. This product is categorized as Evaluation Modules Type: Current Mode PWM Controllers Bulk is the packaging method for this product This product is designed DRV110 DRV120 amplifier. The Power Management, Solenoid Control is the Main-Purpose. Primary-Attributes: - IC package type: DRV110 Maximum operating temperature of + 35 C Minimum operating temperature: - 40 C This product is an DRV110A 14-pin TSSOP. This tool is designed for the DRV110 DRV120. Input Voltage Range: 7 V to 48 V 100 V to 240 V

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DRV110EVM Specifications
A: Is the cutoff frequency of the product Series?
Q: Yes, the product's Series is indeed DRV110
A: At what frequency does the Product?
Q: The product Product is Evaluation Modules.
A: What is the Type of the product?
Q: The Type of the product is Current Mode PWM Controllers.
A: What is the Packaging of the product?
Q: The Packaging of the product is Bulk.
A: What is the For-Use-With of the product?
Q: The For-Use-With of the product is DRV110 DRV120.
A: Is the cutoff frequency of the product Main-Purpose?
Q: Yes, the product's Main-Purpose is indeed Power Management, Solenoid Control
A: At what frequency does the Primary-Attributes?
Q: The product Primary-Attributes is -.
A: Is the cutoff frequency of the product Utilized-IC-Part?
Q: Yes, the product's Utilized-IC-Part is indeed DRV110
A: At what frequency does the Maximum-Operating-Temperature?
Q: The product Maximum-Operating-Temperature is + 35 C.
A: What is the Minimum-Operating-Temperature of the product?
Q: The Minimum-Operating-Temperature of the product is - 40 C.
A: What is the Description-Function of the product?
Q: The Description-Function of the product is DRV110A 14-pin TSSOP.
A: What is the Tool-Is-For-Evaluation-Of of the product?
Q: The Tool-Is-For-Evaluation-Of of the product is DRV110 DRV120.
A: Is the cutoff frequency of the product Input-Voltage?
Q: Yes, the product's Input-Voltage is indeed 7 V to 48 V 100 V to 240 V