| Mfr. #: | DAC8760EVM |
|---|---|
| Өндіруші: | Texas Instruments |
| Сипаттама: | EVAL BOARD 16BIT DAC |
| Өміршеңдік кезең: | Осы өндірушіден жаңа. |
| Деректер тізімі: | DAC8760EVM Деректер тізімі |


Product belongs to the DAC8760 series. This product is categorized as Evaluation Kits Type: DAC Bulk is the packaging method for this product This product is designed DAC8760 amplifier. This product is an Complete evaluation kit that includes a USB-based motherboard and software. This tool is designed for the DAC8760. USB interface type

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8760EVM Specifications
A: At what frequency does the Series?
Q: The product Series is DAC8760.
A: What is the Product of the product?
Q: The Product of the product is Evaluation Kits.
A: What is the Type of the product?
Q: The Type of the product is DAC.
A: Is the cutoff frequency of the product Packaging?
Q: Yes, the product's Packaging is indeed Bulk
A: At what frequency does the For-Use-With?
Q: The product For-Use-With is DAC8760.
A: What is the Description-Function of the product?
Q: The Description-Function of the product is Complete evaluation kit that includes a USB-based motherboard and software.
A: At what frequency does the Tool-Is-For-Evaluation-Of?
Q: The product Tool-Is-For-Evaluation-Of is DAC8760.
A: At what frequency does the Interface-Type?
Q: The product Interface-Type is USB.