DAC8581EVM

Mfr. #: DAC8581EVM
Өндіруші: Texas Instruments
Сипаттама: EVALUATION MODULE FOR DAC8581EVM
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DAC8581EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8581EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the DAC8581.

DAC8581EVM Image

DAC8581EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8581EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of DAC8581

DAC8581EVM

DAC8581EVM Specifications

DAC8581EVM FAQ
  • A: Is the cutoff frequency of the product Product?

    Q: Yes, the product's Product is indeed Evaluation Boards

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed DAC

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: What is the Operating-Supply-Voltage of the product?

    Q: The Operating-Supply-Voltage of the product is 3.3 V to 5 V.

  • A: At what frequency does the Tool-Is-For-Evaluation-Of?

    Q: The product Tool-Is-For-Evaluation-Of is DAC8581.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
91,77 $
91,77 $
10
87,18 $
871,82 $
100
82,59 $
8 259,30 $
500
78,00 $
39 002,25 $
1000
73,42 $
73 416,00 $
Top