DAC8555EVM

Mfr. #: DAC8555EVM
Өндіруші: Texas Instruments
Сипаттама: DAC8555EVM
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DAC8555EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8555EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the DAC8555. SPI interface type

DAC8555EVM Image

DAC8555EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8555EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of DAC8555
  • Interface-Type SPI

DAC8555EVM

DAC8555EVM Specifications

DAC8555EVM FAQ
  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is DAC.

  • A: At what frequency does the Packaging?

    Q: The product Packaging is Bulk.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V to 5 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DAC8555

  • A: Is the cutoff frequency of the product Interface-Type?

    Q: Yes, the product's Interface-Type is indeed SPI

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
56,74 $
56,74 $
10
53,91 $
539,08 $
100
51,07 $
5 107,05 $
500
48,23 $
24 116,65 $
1000
45,40 $
45 396,00 $
Top