DAC8550EVM

Mfr. #: DAC8550EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MODULE FOR DAC8550
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DAC8550EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC8550EVM Overview

This product is categorized as Evaluation Boards Type: DAC This product operates at a 3.3 V to 5 V supply voltage for reliable performance. This tool is designed for the DAC8550. SPI interface type

DAC8550EVM Image

DAC8550EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC8550EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Operating-Supply-Voltage 3.3 V to 5 V
  • Tool-Is-For-Evaluation-Of DAC8550
  • Interface-Type SPI

DAC8550EVM

DAC8550EVM Specifications

DAC8550EVM FAQ
  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is DAC.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 3.3 V to 5 V

  • A: What is the Tool-Is-For-Evaluation-Of of the product?

    Q: The Tool-Is-For-Evaluation-Of of the product is DAC8550.

  • A: At what frequency does the Interface-Type?

    Q: The product Interface-Type is SPI.

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
73,50 $
73,50 $
10
69,82 $
698,25 $
100
66,15 $
6 615,00 $
500
62,48 $
31 237,50 $
1000
58,80 $
58 800,00 $
Top