DAC5674EVM

Mfr. #: DAC5674EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MODULE FOR DAC5674
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DAC5674EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC5674EVM Overview

This product is categorized as Evaluation Boards Type: DAC Bulk is the packaging method for this product This product operates at a 3.3 V supply voltage for reliable performance. This tool is designed for the DAC5674.

DAC5674EVM Image

DAC5674EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC5674EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Product Evaluation Boards
  • Type DAC
  • Packaging Bulk
  • Operating-Supply-Voltage 3.3 V
  • Tool-Is-For-Evaluation-Of DAC5674

DAC5674EVM

DAC5674EVM Specifications

DAC5674EVM FAQ
  • A: At what frequency does the Product?

    Q: The product Product is Evaluation Boards.

  • A: What is the Type of the product?

    Q: The Type of the product is DAC.

  • A: Is the cutoff frequency of the product Packaging?

    Q: Yes, the product's Packaging is indeed Bulk

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 3.3 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DAC5674

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
28,64 $
28,64 $
10
27,20 $
272,03 $
100
25,77 $
2 577,15 $
500
24,34 $
12 169,90 $
1000
22,91 $
22 908,00 $
Top