DAC3162EVM

Mfr. #: DAC3162EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MODULE FOR DAC3162
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: DAC3162EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
DAC3162EVM Overview

Product belongs to the DAC3162 series. This product is categorized as Evaluation Boards Type: DAC This product operates at a 5 V to 7 V supply voltage for reliable performance. This tool is designed for the DAC3162.

DAC3162EVM Image

DAC3162EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

DAC3162EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation Boards - Analog to Digital Converters (ADCs)
  • Series DAC3162
  • Product Evaluation Boards
  • Type DAC
  • Operating-Supply-Voltage 5 V to 7 V
  • Tool-Is-For-Evaluation-Of DAC3162

DAC3162EVM

DAC3162EVM Specifications

DAC3162EVM FAQ
  • A: At what frequency does the Series?

    Q: The product Series is DAC3162.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: At what frequency does the Type?

    Q: The product Type is DAC.

  • A: At what frequency does the Operating-Supply-Voltage?

    Q: The product Operating-Supply-Voltage is 5 V to 7 V.

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed DAC3162

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
298,50 $
298,50 $
10
283,58 $
2 835,75 $
100
268,65 $
26 865,00 $
500
253,72 $
126 862,50 $
1000
238,80 $
238 800,00 $
Top