CDCLVP1208EVM

Mfr. #: CDCLVP1208EVM
Өндіруші: Texas Instruments
Сипаттама: EVAL MODULE FOR CDCLVP1208
Өміршеңдік кезең: Осы өндірушіден жаңа.
Деректер тізімі: CDCLVP1208EVM Деректер тізімі
Due to semiconductor in short supply from 2021,below price is the Normal price before 2021.please send inquire to confirm.
Product Details
CDCLVP1208EVM Overview

Product belongs to the - series. This product is categorized as Evaluation Boards Type: Clock Buffers Bulk is the packaging method for this product This product's 200 MHz 2 GHz range is 0Hz to 2.2GHz. The Timing, Clock Buffer / Driver / Receiver / Translator is the Main-Purpose. Primary-Attributes: 2 Inputs, 4 Outputs IC package type: CDCLVP1208 This product operates at a 2.375 V to 3.6 V supply voltage for reliable performance. This tool is designed for the CDCLVP1208.

CDCLVP1208EVM Image

CDCLVP1208EVM

Image shown is a representation only. Exact specifications should be obtained from the product data sheet.

CDCLVP1208EVM Specifications
  • Manufacturer Texas Instruments
  • Product Category Evaluation and Demonstration Boards and Kits
  • Series -
  • Product Evaluation Boards
  • Type Clock Buffers
  • Packaging Bulk
  • Frequency 200 MHz 2 GHz
  • Main-Purpose Timing, Clock Buffer / Driver / Receiver / Translator
  • Primary-Attributes 2 Inputs, 4 Outputs
  • Embedded No
  • Utilized-IC-Part CDCLVP1208
  • Operating-Supply-Voltage 2.375 V to 3.6 V
  • Tool-Is-For-Evaluation-Of CDCLVP1208

CDCLVP1208EVM

CDCLVP1208EVM Specifications

CDCLVP1208EVM FAQ
  • A: What is the Series of the product?

    Q: The Series of the product is -.

  • A: What is the Product of the product?

    Q: The Product of the product is Evaluation Boards.

  • A: Is the cutoff frequency of the product Type?

    Q: Yes, the product's Type is indeed Clock Buffers

  • A: What is the Packaging of the product?

    Q: The Packaging of the product is Bulk.

  • A: What is the Frequency of the product?

    Q: The Frequency of the product is 200 MHz 2 GHz.

  • A: What is the Main-Purpose of the product?

    Q: The Main-Purpose of the product is Timing, Clock Buffer / Driver / Receiver / Translator.

  • A: At what frequency does the Primary-Attributes?

    Q: The product Primary-Attributes is 2 Inputs, 4 Outputs.

  • A: What is the Utilized-IC-Part of the product?

    Q: The Utilized-IC-Part of the product is CDCLVP1208.

  • A: Is the cutoff frequency of the product Operating-Supply-Voltage?

    Q: Yes, the product's Operating-Supply-Voltage is indeed 2.375 V to 3.6 V

  • A: Is the cutoff frequency of the product Tool-Is-For-Evaluation-Of?

    Q: Yes, the product's Tool-Is-For-Evaluation-Of is indeed CDCLVP1208

1680 In Stock
Can ship immediately
Please enter the quantity you need to buy.
Саны
Тауар өлшемінің бағасы
Қосымша. Бағасы
1
172,52 $
172,52 $
10
163,89 $
1 638,89 $
100
155,26 $
15 526,35 $
500
146,64 $
73 318,90 $
1000
138,01 $
138 012,00 $
Top